Retail & Mixed Use
MEP engineering for malls, high-street retail and mixed-use podiums: crowds kept comfortable, tenants connected quickly, and atria that stay clear of smoke.
- Retail projects
- 9
- Types
- Malls, high street, mixed use
- Focus
- Crowds, tenants, smoke control
- Ratings
- IGBC, LEED

What a mall asks of its engineer
A mall changes tenants every few years, fills with crowds at weekends, and has atria that smoke would use as a chimney.
Comfort for weekend crowds
Cooling and fresh air sized for peak footfall, with CO₂ control so the plant eases off on quiet weekdays.
Tenants connected fast
Power, chilled water, drainage and exhaust ready for every unit, so fit-outs connect without reworking the mall.
Smoke control in the atrium
Atrium smoke exhaust and make-up air designed and proven, so the open spaces stay safe.
What we deliver
HVAC and smoke control
Covers
Chilled water, air handling for malls and food courts, atrium smoke exhaust.
Typical outputs
Load and CFD studies, smoke control strategy.
Power and metering
Covers
Substation, tenant feeders and sub-metering, standby power, facade and atrium lighting.
Typical outputs
Single-line diagrams, tenant allowances, metering scheme.
PHE and kitchens
Covers
Water, drainage, grease interceptors and gas for food courts.
Typical outputs
Water balance, drainage design, gas layouts.
Fire and life safety
Covers
Sprinklers, detection, evacuation and fire fighting for large public spaces.
Typical outputs
Fire strategy, hydraulic calculations, fire NOC.
Codes and standards
- National Building Code of India 2016, Parts 4 and 8
- NFPA 92 for smoke control, where specified
- ECBC 2017
- IGBC Green New Buildings and LEED
- Local fire service regulations for mercantile buildings
- Tenant design criteria for each anchor store







