What we do

Every service is designed in-house and issued from one coordinated model.

What we do overview
BIMOne federated model, coordinated every week and handed over as built.

Sectors

Codes, loads and risk differ by building type. Each sector has its own engineers.

Sectors overview
HealthcareHospitals, medical colleges and diagnostics.

About

An MEP design consultancy founded in Indore in 2019, with a branch in Mumbai.

About overview
Careers at OneMEPReal projects from the first month.
OneMEP

Case study · 21 Oct 2026 · 8 min read

Reducing a pharma plant's HVAC energy by 28 percent

Zoning, pressure cascades and heat recovery in a GMP facility in Pithampur, and the three decisions that saved the most.

NSName Surname
Head of Industrial Engineering, Indore

Process buildings and pipe racks at a pharmaceutical plant

A formulation plant spends more on air than on almost anything else it runs. In this oral solid dosage facility, HVAC was 61 percent of the electricity bill before we started. The client asked for a retrofit that would not interrupt production or put the GMP classification at risk.

Where the energy went

  • Every room supplied at the air change rate of its worst-case grade, including corridors and stores.
  • Reheat coils running all year to hold humidity in rooms that did not need it.
  • Exhaust from the granulation suites dumped outside at 22 °C.
Air handling units on the plant roof
Air handling units on the roof
Supply ductwork into the clean corridor
Supply into the clean corridor
Chilled-water valve station
Chilled-water valve station

Three decisions that saved the most

  1. Zoning by actual grade: corridors and support areas moved to lower air change rates, with the pressure cascade kept intact.
  2. Humidity control by dehumidifying wheel only where the product needs it, with reheat taken out of the rest.
  3. Run-around heat recovery on the granulation exhaust, pre-cooling the fresh air for the compression suites.

Each change was modelled against the room data sheets and validated in a shutdown weekend, with particle counts and pressure readings taken before handing each zone back to production.

The plant after the retrofit
Utilities block after the retrofit, with the new heat recovery coils on the roof.

The cheapest air is the air a room never needed.

Results after twelve months

HVAC energy fell by 28 percent against the twelve months before the retrofit, normalised for production volume and weather. No zone lost its classification, and the work paid back in 22 months.