Data Centres
MEP engineering for Tier III and IV, hyperscale and edge data centres: power and cooling with no single point of failure, and efficiency measured in PUE.
- Data centre projects
- 6
- Topologies
- N+1 to 2N
- Focus
- Power, cooling, resilience
- Measured by
- PUE

What a data centre asks of its engineer
A data centre exists never to go down. Every path for power and cooling needs a second one, and every kilowatt of overhead shows up in the PUE.
No single point of failure
Power and cooling paths duplicated to the tier the client needs, and maintainable without shutting a hall down.
Cooling at high density
Air and liquid cooling for racks from 5 to over 30 kW, with containment and free cooling where the climate allows.
Growth in phases
Plant and power sized for the first phase and planned for the last, so halls are added without disturbing live ones.
What we deliver
Power and resilience
Covers
HT intake, transformers, standby generation, UPS and distribution to N+1 or 2N.
Typical outputs
Single-line diagrams, redundancy studies, load growth plans.
Cooling
Covers
Chilled-water, DX and liquid cooling, containment and free cooling.
Typical outputs
Cooling load and CFD studies, plant schedules.
Monitoring and controls
Covers
BMS, power monitoring and DCIM integration for power and cooling.
Typical outputs
Points lists, control strategies, integration specifications.
Fire protection
Covers
Detection, gas suppression and water mist for data halls and plant.
Typical outputs
Fire strategy, suppression design, cause and effect.
Codes and standards
- Uptime Institute tier topology, as specified
- TIA-942, data centre infrastructure
- ASHRAE TC 9.9 thermal guidelines
- National Building Code of India 2016, Parts 4 and 8
- NFPA 75 and NFPA 2001, for IT rooms and clean agents
- IS 3043 and IEC 62305