The brief
Two towers of 32 floors with 640 apartments, a clubhouse and three basements. The developer wanted IGBC Gold, low running costs for the residents’ association, and no water tankers in summer.
- Client
- Example Housing Pvt Ltd
- Architect
- Example Design Studio
- Services
- HVAC, Electrical, PHE, Fire & Life Safety, VT
- Year
- 2020 to 2024


Water first
Indore summers decide a residential building’s water design. We sized the sewage treatment plant to recycle all flushing and landscape water, and split the storage so the recycled and potable systems can never meet.
Rainwater from the roofs and podium recharges the ground through eight pits, sized from twenty years of local rainfall records.


What made the difference
- A lift traffic study for the 7 to 9 pm return peak, not the morning one, which set six lifts per tower instead of eight.
- Dual plumbing with colour-coded recycled water pipes and separate tanks.
- Common-area loads on a separate meter, so the residents’ association sees what it pays for.




