Industrial & Manufacturing
MEP and utilities for pharma, FMCG, automotive and logistics plants: utilities sized to production, clean rooms that hold their grade, and power that does not stop the line.
- Industrial projects
- 32
- Plants
- Pharma, FMCG, auto, logistics
- Focus
- Utilities, clean rooms, power
- Standards
- GMP, ISO 14644

What a plant asks of its engineer
A plant is judged by uptime. Every utility, room and feeder exists to keep production running, and audits check that it does.
Utilities sized to production
Steam, compressed air, process water and cooling built up machine by machine, with diversity agreed with production.
Clean rooms that hold their grade
Air changes, pressure cascades and filtration designed for the grade they will be validated against.
Power that does not stop the line
Redundancy and protection decided against the cost of a lost hour, with shutdowns planned around production.
What we deliver
Process utilities
Covers
Steam, compressed air, nitrogen, process and cooling water.
Typical outputs
Utility balances, P&IDs, line lists.
Clean rooms and HVAC
Covers
GMP and ISO-classified rooms, pressure cascades, dust extraction and comfort cooling.
Typical outputs
Room data sheets, airflow plans, validation support.
Plant power
Covers
HT substations, motor control centres, power factor correction and power quality.
Typical outputs
Load lists, single-line diagrams, protection studies.
Water and effluent
Covers
Raw water treatment, ETP, STP and zero liquid discharge.
Typical outputs
Water balance, treatment schemes, plant sizing.
Codes and standards
- Schedule M and WHO GMP, for pharmaceutical plants
- ISO 14644, clean room classification
- Factories Act and state factory rules
- National Building Code of India 2016, Part 4
- Indian Boiler Regulations, for steam
- CPCB norms for effluent discharge
Industrial & Manufacturing projects
All industrial projects
Industrial & Manufacturing · Pithampur
Pharma Formulations Plant
420,000 sq ft · Completed 2024 · GMP

Industrial & Manufacturing · Chakan
Automotive Components Plant
600,000 sq ft · Completed 2021

Industrial & Manufacturing · Bengaluru
Food processing unit, Bengaluru
750,000 sq ft · Completed 2024