What we do

Every service is designed in-house and issued from one coordinated model.

What we do overview
BIMOne federated model, coordinated every week and handed over as built.

Sectors

Codes, loads and risk differ by building type. Each sector has its own engineers.

Sectors overview
HealthcareHospitals, medical colleges and diagnostics.

About

An MEP design consultancy founded in Indore in 2019, with a branch in Mumbai.

About overview
Careers at OneMEPReal projects from the first month.
OneMEP

Infinity Business Park: glazed office facade with fins

Commercial & Offices · Mumbai

Infinity Business Park

2,400 TR cooling · LEED Gold · Completed 2025

Infinity Business Park

Grade A offices over a retail podium, with a chilled-water plant designed to cut peak demand by 18 percent.

Location
Bandra Kurla Complex, Mumbai
Built-up area
1.2 million sq ft
Status
Completed 2025
Certification
LEED Gold, Core and Shell

Measured outcomes

Each result against the baseline it had to beat. The green end of each bar is the saving.

  • −18%

    Peak electrical demand

    Baseline 11.7 achieved 9.6 MVA

    Measured Utility meter, first summer peak, against the schematic design.

  • −14%

    Energy performance index

    Baseline 180 achieved 155 kWh/m² a year

    Measured Twelve months of BMS metering, against the ECBC 2017 baseline.

  • −17%

    Chilled-water plant efficiency

    Baseline 0.75 achieved 0.62 kW/TR

    Measured Plant energy meter over twelve months, against the ASHRAE 90.1 Appendix G plant.

  • −19%

    Potable water demand

    Baseline 520 achieved 420 m³ a day

    Modelled Water balance at full occupancy, against the NBC 2016 per-person norm.

The brief

The developer wanted a Grade A office campus that could be leased floor by floor to tenants with very different fit-out densities, from a trading floor to a law firm, without re-engineering the base build each time.

LEED Gold was a leasing requirement, and the plant had to fit a podium roof already fixed by the architecture.

Client
Example Developers Ltd
Architect
Example Architects LLP
PMC
Example Project Managers
Services
HVAC, Electrical, PHE, Fire & Life Safety, IBMS, VT, ELV
Year
2021 to 2025
Open-plan office floor
A typical office floor: exposed services coordinated to a clear 3.0 m.
Ductwork in the podium plant room

Our approach

We designed a variable primary flow chilled-water plant with three unequal chillers, so the plant runs efficiently at the 30 to 60 percent part-load conditions that dominate a Mumbai office year.

Floor-by-floor air handling with demand-controlled ventilation serves each tenant's density without touching the central plant. A busbar riser with tap-off boxes on every floor connects tenant loads from 60 to 150 W per m² without new cabling.

Valve sets on the chilled-water headers

Engineering highlights

  • Plant optimisation and thermal storage sizing reduced contract demand by 18 percent against the schematic design.
  • All seven MEP disciplines federated weekly with architecture and structure; no unresolved hard clashes at construction issue.
  • Fire strategy with refuge floors and pressurised stairs approved by the fire authority at first submission.
West elevation
West elevation
Tower from the podium
Tower from the podium
Design review on site
Design review on site
Campus at dusk
Campus at dusk

“The contractors priced the building we were going to build. We had no MEP variations on the base build, and tenant fit-outs have connected without touching the central plant.”

Name Surname, Project Director, Example Developers Ltd