The brief
The developer wanted a Grade A office campus that could be leased floor by floor to tenants with very different fit-out densities, from a trading floor to a law firm, without re-engineering the base build each time.
LEED Gold was a leasing requirement, and the plant had to fit a podium roof already fixed by the architecture.
- Client
- Example Developers Ltd
- Architect
- Example Architects LLP
- PMC
- Example Project Managers
- Services
- HVAC, Electrical, PHE, Fire & Life Safety, IBMS, VT, ELV
- Year
- 2021 to 2025


Our approach
We designed a variable primary flow chilled-water plant with three unequal chillers, so the plant runs efficiently at the 30 to 60 percent part-load conditions that dominate a Mumbai office year.
Floor-by-floor air handling with demand-controlled ventilation serves each tenant's density without touching the central plant. A busbar riser with tap-off boxes on every floor connects tenant loads from 60 to 150 W per m² without new cabling.

Engineering highlights
- Plant optimisation and thermal storage sizing reduced contract demand by 18 percent against the schematic design.
- All seven MEP disciplines federated weekly with architecture and structure; no unresolved hard clashes at construction issue.
- Fire strategy with refuge floors and pressurised stairs approved by the fire authority at first submission.