BIM
Coordinated models from LOD 300 to 500, clash detection before every issue, quantities from the model, and an as-built model for the facility team.
- Model
- LOD 300 to 500
- Coordination
- Weekly, every discipline
- Clash checks
- Before every issue
- Handover
- As-built with asset data

One model, coordinated every week
Every discipline works in one federated model with the architecture and structure. Clashes are found and closed in the model each week, so the drawings that leave the office already fit together.
Quantities, schedules and sections come from the same model, so a change made once shows everywhere. At handover the model becomes the record the facility team runs the building with.
- A BIM execution plan agreed with the client and design team at the start.
- Clash detection run and resolved before every drawing issue.
- Quantities taken from the model for tender and cost checks.
- As-built models with asset data for operations.
What we model
Modelling
Covers
MEP models linked to the architecture, from LOD 300 for design to LOD 400 for fabrication.
Typical outputs
Discipline models, families with real equipment data, model standards.
Coordination and clash detection
Covers
Federated models with structure and architecture, clash tests and weekly coordination meetings.
Typical outputs
Clash reports, resolution logs, coordinated services drawings.
Quantity take-off
Covers
Measured quantities for ducts, pipes, cables, equipment and fittings from the model.
Typical outputs
BOQ quantities, comparisons between revisions.
Shop drawings and review
Covers
Fabrication drawings, builder's work drawings and review of contractors' shop drawings.
Typical outputs
Shop drawings, sleeve and opening drawings, review comments.
Digital twin handover
Covers
As-built models linked to asset data, O&M information and the BMS points list.
Typical outputs
LOD 500 models, asset registers, structured handover data.
How we deliver
- 01
Plan
Execution plan
BIM execution plan, model standards, responsibilities and the coordination schedule.
- 02
Model
Discipline models
MEP models built on the architectural and structural models at the agreed level of detail.
- 03
Coordinate
Clash free
Weekly federation, clash tests and resolution until no hard clashes remain.
- 04
Document
Drawings from the model
Drawings, sections, schedules and quantities generated from the coordinated model.
- 05
Hand over
As built
Site changes captured, asset data attached and the model handed to the facility team.
BIM projects
All BIM projects
Commercial & Offices · Mumbai
Infinity Business Park
1.2 million sq ft · Completed 2025 · LEED Gold

Healthcare · Bhopal
Lakeview Multispeciality Hospital
360,000 sq ft · Ongoing · 450 beds

Data Centres · Navi Mumbai
Edge Data Centre, Phase 1
120,000 sq ft · Ongoing